Steel bar sleeve connection construction technology Wall panel hoisting in place → base treatment → grouting cavity sealing → grouting construction preparation → joint slurry preparation → check joint slurry → pressing grouting → grouting material overflow → stop grouting → blocking rubber grouting material → removing grouting and drainage pipe blocking on member → final inspection → sleeve connection test